1. 毕业设计(论文)的内容和要求
本课题将对燃气电厂燃烧后碳捕集过程进行机理建模,利用Aspen Plus量化燃烧后碳捕集装置的成本,并在此基础上实现优化过程设计。
最后把整个研究内容写成毕业论文。
毕业论文的内容和要求如下:(1)通过文献阅读和总结分析,给出如下内容:燃气电厂碳捕集机组过程设计的研究现状,现有过程设计问题存在的问题或不足,本课题拟开展的研究内容和预期目标。
2. 参考文献
[1] EIA U S. Capital cost estimates for utility scale electricity generating plants[R]. U. S. Department of Energy, 译. Washington DC: U.S. Energy Information Administration, 2016.[2] Boot-Handford M E, Abanades J C, Anthony E J, et al. Carbon capture and storage update[J]. Energy 189.[3] Sharifzadeh M, Shah N. Carbon capture from natural gas combined cycle power plants: Solvent performance comparison at an industrial scale[J]. AIChE Journal, 2016, 62(1): 166179.[4] Manzolini G, Sanchez Fernandez E, Rezvani S, et al. Economic assessment of novel amine based CO2 capture technologies integrated in power plants based on European Benchmarking Task Force methodology[J]. Applied Energy, 2015, 138: 546558.[5] Luo X, Wang M. Optimal operation of MEA-based post-combustion carbon capture for natural gas combined cycle power plants under different market conditions[J]. International Journal of Greenhouse Gas Control, 2016, 48: 312320.[6] Agbonghae E O, Hughes K J, Ingham D B, et al. Optimal process design of commercial-scale amine-based CO2 capture plants[J]. Industrial Engineering Chemistry Research, 2014, 53(38): 1481514829.[7] Plus A. Rate Based model of the CO2 capture process by MEA using Aspen Plus[J]. Aspen Technology Inc, Cambridge, MA, USA, 2008.[8] Li B-H, Zhang N, Smith R. Simulation and analysis of CO2 capture process with aqueous monoethanolamine solution[J]. Applied energy, 2016, 161: 707717.[9] Alberici S, Boeve S, Van Breevoort P, et al. Subsidies and costs of EU energy[J]. An interim report, Ecofys, by order of European Commission, 2014.[10] Sharifzadeh M, Shah N. MEA-based CO2 capture integrated with natural gas combined cycle or pulverized coal power plants: Operability and controllability through integrated design and control[J]. Journal of Cleaner Production, 2019, 207: 271283.[11] 自查文献...